Wednesday, November 5, 2008

The End (The Best Part)


This is the end! If you haven’t read the previous 3 posts, you should go back and check them before you start this one.

At this point all I have to do is build a glass block wall and tile the walls! That’s it!

Fortunately, building a glass block wall is really easy and I had tiled before, so it should be no problem. But remember, I could write a book on how to be a dummy for dummies. I’m bound to mess it up somehow!

The glass block wall was the most fun I’ve had. All I needed was a couple tubes of their silicone, a caulking gun, some spacers and some anchors and I was golden. It was really easy and makes for a really nice feature on any home improvement project. I hope I have more opportunities to work with glass blocks. The only downside is that it can get expensive fast, but it really isn’t too much to spend if you don’t have to do too many end blocks or turns, that’s where you spend the real money!

The tiling wasn’t too bad either. Apparently Jennifer was paying attention to the hardness of the tile when I was just looking at how the tile looked. We ended up picking the hardest class of tile, which is a good thing when you are working with it. I dropped a couple pieces from working height and it didn’t so much as chip the edges. This was rough tough tile I had. The problem was that it was a bear to cut through with anything other than a wet tile saw. I had a handheld saw that didn’t do me any good and I had a masonry hole saw bit for my drill that did little more than scratch the surface. Those small annoyances were very pale in comparison to the fact that in over 150 tiles that I went through, only 2 were broken in the boxes.

I got to spend a little money on a new tile saw for this and future projects. My original intent was to rent a saw, but when I found out that it was going to be over $50 per day and that it would take me 2 days to do this project if I really busted my hump, I decided I’d rather take it at my own pace and purchase a good saw. I also knew that I would have to tile the kitchen, entry way, and the whole downstairs at some point and it would cost a lot more in the long run if I just rented. Plus if I bought it I’d at least have something to show for the money I spent!

When I was looking for a saw there was a huge discrepancy in prices, anywhere from about $80 all they way up to $800. I took a look at the $800 saw and understood why it cost so much. I fell in love with it, but it wasn’t meant to be. I had to go with something I could justify and so I got a good saw, but it was less than half that big number. I also bought a good blade to go along with the saw because the one that came with it was not going to hold up through the project, especially with such hard tiles. I really have to say that a tile saw with a laser is a must. The blade on my saw is very hard to see and without the laser light shining on the tile it literally would have taken forever before I got all the cuts done.

Another plus on having such a big shower was that I was able to cut the tiles right there in the shower without having to worry about making a mess. The water would just go down the drain and the mess would just get wiped off. And oh what a mess I made!

I did some prepping to determine what the tiles needed to do to be level. We decided to put the tiles on a 45 degree diamond pattern rather than the typical square pattern. So I had to find level and plumb lines to make sure that the corners of each tile went through the lines. It made things a little more difficult to go on the slant, but I think it was well worth it in the end. Since the walls were on a slant I decided to throw a little contrast in and make the backing on the shelves a square pattern, but add a few cuts so that it wasn’t just a whole piece with filler around it.

The whole time I was laying tile I was working on the fly. I had the mortar mixed and would put it on the wall and figure out the cuts I needed to make while I was laying the tile. Typically you would lay the pattern down before you even thought about mixing the mortar, but you really can’t do that with a wall. There isn’t any way of holding the tiles on there without using the mortar, so you have to work quickly and get things right! After all was said and done two of the tiles had to come off and be redone. One didn’t adhere well and I didn’t want it to possibly fall off in the future, the other had a bad cut and wouldn’t be covered by the fixture and I had to re cut it.

The major problem I had on the tiling part of the project was the first night of grouting the tile after the mortar had dried. I took the morning to try and clean the grout lines free of excess mortar and otherwise prepare for the grouting. To me, grouting is the fun part of tiling because it is so easy. You rub it in, you wipe it down with a sponge, and you wipe it down again. Unfortunately I decided to do too much grouting before I wiped the first time and it got hard. I further compounded the problem by taking a break to get a couple kids out of the house and let Jennifer have a break. She told me that she’d wipe it down while I was in class that night after the kids went down for the night and it would be ready for me to finish grouting when I got home. This was a huge faux pas on my part. Grout hardens quickly. And it is near impossible to get off once it does.

Again I am thankful that we had such hard tile because we ended up using chisels to scrape the grout off of the tile. I had about a wall and a half of dried grout to clean off the tiles. This is the part that Jennifer really pitched in and worked her elbows off. Don’t get me wrong, she did a lot of kiddo watching to let me work on the project, but she really worked her tail off on this part. We both did! It took 3 days to get all the grout off. We left damp paper towels on the grout left on the wall and a half of tiles to try and keep it from setting. In the end, the best thing we could have done was used acid to help remove the grout. We got the tip online that Muriatic acid (HCl) works to remove dried on grout if you get it soon enough. It did help and it even fizzes to tell you it’s working. I’m so glad it came off without damaging the tiles.

After that we finished grouting the shower and this time Jennifer was about 5 minutes behind me with the sponge and it was a breeze. It took about one hour to finish two walls versus the 3 days for a wall and a half. Word to the wise: if you grout, make sure you wipe... quickly!

When the grout was dry the next day I sealed the whole wall. Tile, grout and all got a shot of sealer and even though it says not to spray it, I did, and it was horribly volatile and smelled terrible. I shot it and ran out as soon as I could. But it got done quick and all that was left was to put on the fittings, caulk it and clean the mess I had made of mortar and grout on the floor.

The fittings went on just fine and the caulking wasn’t too much trouble, but the mess I had made on the floor was overwhelming. It turns out we had to scrape it and even then we didn’t get everything up. Jennifer again jumped in and did the clean up work. I truly have a understanding and hard working wife. We ended up damaging the nice stain job and in some cases couldn’t even get enough of the stuff off the floor to get to the stain. So we re-etched, re-stained, and re-sealed the floor and it turned out just as nicely the second time as it did the first time, except now it has a little more character!

So that’s my story, and this is my

product.I hope you

enjoyed my tale and if you have any questions or want any help with your own project… please… don’t call me!

The shower is too big for one final picture, so here are a couple of them. Enjoy!




Gig Me (Part C of D)

Yes, usually the slogan we Aggies like to shout is Gig’em, but the shower Gigged me. I know when most people hear gig, if they are from the south anyway, they think of frog gigging. That’s not the same as an Aggie Gig. You see, the Ags are a bunch of farmers and military brats rolled into one well rounded hillbilly. (I don’t want any comments from those t-sips out there, yeah you know who you are) It turns out this gig comes from the military side. When you’re an underclassman in a military school you have to have everything in order, spic’n span, spit shined, ship shaped, etc. This particularly fell to the student’s appearance. If his uniform wasn’t tucked in just right he would get a demerit, otherwise known as a gig. Hence when Aggies say Gig’em, we are telling the world that we’re gonna find your weakness and exploit it and then laugh at you. Well the concrete found my weakness and kicked my rear. And then it laughed, while I cried.

I was not expecting the laying of the concrete to be such a pain. I envisioned laying down the base pan, pouring the concrete, taking a little time to make sure it sloped properly for draining and I’d just have to wait for it to dry. If you think that sounds like what should happen, dream again!

Concrete is hard to work with. First off, it’s really heavy stuff. It’s made of heavy stuff and then you add rocks and water, both of which are heavy. It’s also hard to mix. Even with a stirring tool connected to my cordless drill it takes a beating on your forearms and elbows. Jennifer held the drill and stirred while I poured mortar, sand, pea gravel, and water into the 5 gallon bucket. I swear, each bucket weighed between 50-80 lbs, and I must have carried more than 20 buckets for the whole project.

So it turned out that I needed a sub base before I put the shower pan liner down. That made sense to me because if somehow you do get a leak to the shower pan, you want that water to eventually flow towards the drain. So ok, I need an extra layer of concrete, no biggie! I put down the first layer of concrete and didn’t worry too much that the 14” trowel I was using was square on the ends and left huge streaks in the concrete when I would attempt to smooth it out. I used a nail with marks on it to tell me the depth of the concrete to make sure I had the slope right. I wanted about a ¼” per foot incline going away from the drain. And I would put about the same slope on the next layer for an even more dramatic slope. I used a roll of duct tape to keep the concrete out of the drain until I did the top layer that would have the screw-in drain.

Before I even got to the liner I knew that one 5’x6’ pan liner sheet wasn’t going to be big enough for the shower I was building and I was prepared for the fact that I’d have to glue two sheets together. What I wasn’t prepared for was once the two pieces were glued, how do I account for the corners to make sure it drains properly. Internal corners are easy to fold, but there were two external corners which just don’t fold right. You have to cut the liner and glue a patch on and even doing a patch doesn’t quite work right. I was hoping that there were pre-formed external corners that you could buy, because what your really need is for the material to be properly stretched and molded, but alas, no one thought it would be a good idea to make something useful. I seriously would have paid about the same for preformed corners as did for each of the sheets of liner. I tell you I dreaded every second of putting water in that liner to static test it and see if it would hold water.

The static test included putting about 4” of water in the liner to make sure it didn’t leak for 4-6 hours. When the level didn’t drop after the 4 or 5 hours I let it sit, I think I breathed the heaviest sigh I had during this project. So I cut a hole at the drain and attempted to finish out the drain by bolting the drain together. Unfortunately it took me 3 trips over three days to get the right bolts. Darn closing time, why isn’t Lowes open 24/7. Remember, I did most of this project in my free time after our kids went to bed. I had about a 30 minute window to shop for what I needed and if I had to guess and guessed wrong it often meant that I would have to wait until the next day to move forward. This happened to me several times, not just with the bolts. Doh!

So after the first layer of concrete was down, and the shower pan checked out, I was ready to put the top layer on and do the lips for the edges and the base for the glass block wall. I decided to go with lips for two reasons, one was that I didn’t want the standing water in the base of the shower to be right up to the point where the tile met the concrete (that would open me up to leaks) also so that the tile had something to sit on and run down rather than going straight from the wall to the floor. The glass block needed a base too and it would look funny to go straight from the floor and wall to a base, so I guess there were three reasons to go with lips!

My problem here was that I didn’t buy enough mortar and ran out before I could get my desired thickness. So I sloped it evenly with the stuff I had and decided I would finish with yet another layer and get the lips the next time around. As it turned out this layer had huge gashes where I used my trowel, so when I bought the new mortar, I invested in a slightly smaller trowel with rounded ends. This kept the whole surface smooth without any streaks. FYI… wetter concrete makes smoother surfaces. The final layer was drier than the first layer over the shower pan and was hence a little rougher. This was good because it made for a good non-slip surface without being rough to the touch.

Each time I laid concrete it took 2 days to dry. This is just annoying when you can see the end of the project coming close and you keep getting delayed time and time again. Argh!

After the final layer of concrete was laid I decided to stain the concrete while the tile wasn’t in so that we wouldn’t have to worry about staining the tile or covering the tile later. So we etched it, stained it and then sealed it. Each step required 4-8 hours of dry time, so this part took a couple days! Sorry, no pix of the nice shower floor!

Tune in next time for the fascinating conclusion of this perilous project!

Plumb, Plumb, Plumb the Shower (Part II of IV)

Once the walls were open, I needed to open up the floor so that I could work with the plumbing, so I took out a 2ft by 5ft section of the floor and saw that the plumbing was pretty much straight forward. Luckily I had set my circular saw to just enough to get through the ¾” plywood. I did this because I didn’t want to hit pipes or electrical in the process, but what I found was that there was a duct box right in the middle of one of my cuts and I’m glad I didn’t tear it up. I could have repaired it with duct tape, but anything you don’t have to repair later is always a plus!

So what I found was hot pipe, cold pipe and drain pipe all where they were supposed to be. The drain needed to be moved from the position at the end where the tub was to the position in the middle of the shower. This was easy enough using PVC and enough elbows to create a doohickey that sent the water the right way and made a trap so that nasty gases don’t come back up the pipes.

For the hot and cold pipes the plumbing specialist at Lowes recommended CPVC rather than copper which kept me from having to solder and made my plumbing experience golden. The shopping experience for this part was nice, and there was only one copper to copper fitting for each valve that I had to solder, so I was pretty happy about that.

I sent Jennifer and our circus, I mean zoo, to her parents house because a house full of needy littl’uns with no running water is a bad idea. She left the night before so that I could get a full day’s work in, and I was appreciative of that. I had gone to give blood the day she left because someone through our church needed my blood type and I was only using most of my blood and sharing is a good thing. The problem is that after you give blood you aren’t supposed to do much. They told me I shouldn’t run a marathon, but I don’t listen to doctors, they’re just really smart people who went to school for many years to perform a very necessary service to those who need it. Why would I listen to someone who knows what they are talking about when I could completely ignore them!

So I ended up doing most of the work the night Jennifer left. I shut off the water, cut the copper, used some groovy fittings called Gator Bite fittings to connect the copper to CPVC and glued all the CPVC fittings up to the valves for the shower. I had to add some short 2x4 blocks to stabilize the valve and shower head connection in place. So I got all that done that night and figured out that I had one spot that went copper without threads to CPVC. I didn’t know if I could glue that part so I figured I’d wait until the next day and ask my specialist from Lowes. Turned out that I had to solder it and if I’d have glued it I would have made a really bad mistake. (Yeah for not making mistakes, too bad it didn’t happen more often!)

I hadn’t soldered anything in a very long time. You see, it had been since my last semester in college about 5 years ago when I got the scars on my left hand from soldering plumbing stuff at my on campus job. So, stupidly, I assumed that having done it once upon a time, I didn’t really need a refresher course on how to solder. I should write a book on how to be a dummy for dummies!

I spent the next 10 hours trying to solder two joints, one on each valve. I must have soldered and re-soldered about 20 times on each joint. It took forever because once I soldered the joint, I had to wait for the valve housing to cool off so that I could plug the metal outlets with plastic plugs that would otherwise melt under the fire of the torch I used for soldering. So I would have to wait for it to cool, then close it off, go turn on the water to see if it would hold, cuss when it wouldn’t, run to turn off the water, and repeat.

Turns out, my problem was that I didn’t use any Flux. (Notice the difference between the nice smooth solder on the bottom and my clumpy solder on top) Flux is this neat stuff that sucks the molten solder into the joint and pretty much coats everything it touches. That gets the solder in to create a nice seal instead of having all the solder just sit on the outside like what was happening to me. So after the 10th hour I broke down (it’s amazing that it took that long, I usually don’t have that much patience… I guess having 5 kids must have prepared me for this moment) I called the specialist and after about 10 minutes on the phone I said… “uh… what’s flux”. After he said “that’s your problem” I went to the store, got the flux and within 2 shots I had my soldering done. It didn’t take more than 40 minutes with the right materials.

Covering the floor and walls with Hardibacker board was the next chore, so I jumped on it and put it up. The big issue you run into with Hardi board is cutting it. I recommend using a circular saw with a regular blade. I attempted to use a masonry blade on my cordless circ saw and it was like using a chisel to chop down a tree. It drained the 18v batteries and caused them to overheat like crazy. I ended up trying to use my Miter saw to cut through the smaller pieces, since a miter saw only has a limited cutting range and I found that the regular blade cuts pretty well. So I switched blades on my circ saw and it worked like a champ. The batteries didn’t overheat as quickly and they lasted much longer.

It took 3 or 4 days to do the Hardi board because I didn’t figure out the blade thing until the 3rd day. I had to cut the little pieces for the shelves and I did those close to the end. Cutting the holes for the valves was a bit of a pain because I didn’t figure out the blade thing before I cut them. Thankfully though, cutting holes with a hole saw was very easy. I just mismeasured by an inch on one of the holes and had to drill it twice. That’s why I have a half moon on one of my boards!

Tune in next time when I go head to head with the concrete flooring and lose over and over again!